?? ??
KO
Machang Bridge; Machang Bridge;

????, ?? ??

?? ??? ???? ??? ??? ????? ?? ???? ?? ??? ?? ??

1.7 km ??, ?? 4???? ???? ????? ?? ??? ??? ?????. ???? ???? ?? ??? ?????, ?? ??? ????? ??? ??? ???. Arup ? ???? ?? ? ?? ?? ???? ???????.

? ????? ??? 400 m, ??? 175 m, 164 m ??? ? ? H ? ??? 740 m ???? ???? ????. ??? ???? ???? ????? ???? ????. parallel wire system ? ??? ???? ?? Shanghai Pujiang Cable Company? ???????. ?? ????? tie-down system ??? ?? end piers ??? VSL mono-strand ???? ????. ?? ??? ? ???? ???? pier shafts? pile caps? ????? ?????.

????? 2008? 7? ???? ? ?? ? ?? ??? 30? ?? ???????.

The project features a 740m, cable-stayed bridge with a main span of 400m, side spans of 175m and two 164m-high, H-shaped pylons.